by Diggersworld.com
Our the first trip to Lakeside Park
This trip has part of the grid and the lights for the 3D-trees.
A view of the site during construction
Grid assembly
The grid started out in pieces and had to be together into one large piece.
Another grid picture
Also, lights are started to be sorted for the large 3D-trees.
Right after raising the grid onto 2ft blocks of wood
A closer picture of the raised grid
The sun is setting - the end of day 1!
The first hole is being dig for the large 3D tree
Also, the lights on the grid are being moved to cover empty spaces.
The 3D tree has been raised
The lights on the tree are being sorted and attached to a lower PVC ring. Also, the arches are
being put in place.
Another picture of the arches being assembled
Also, the other 3D tree in the background.
The 3D tree with lights in place.
Sun was setting - enough for another day!
Almost all the decorations are in place on day 2.